Skip to content

Resources

FY 2026 Utility Rates and Bill Collection Disbursement

 

Chilled Water

Rate Costs
$9.919/MMBtu Resource cost 69.5%
  R&R cost 10.2%
  O&M cost 20.3%

View Rate Schedule: Chilled Water

 

High Temperature Water

Rate Costs
$12.470/MMBtu Resource cost 80.9%
  R&R cost 6.7%
  O&M cost 12.4%

View Rate Schedule: High Temperature Water

 

Electricity

Projected Average Rate Costs

$0.08362/Kwh

 

Resource cost 94.7%
(see schedule for 2024 billing history) R&R cost 2.3%
  O&M cost 3.0%

View Rate Schedule: Electrical

 

Natural Gas

Projected Average Rate Costs

$6.189/Dth

(5-year average)

Resource cost 95.0%
(see schedule for 2023 billing history) R&R cost 2.7%
  O&M cost 2.2%

View Rate Schedule: Natural Gas

 

Water

Rate Costs
$5.0071CCF water Resource cost 79.7%
  R&R cost 14.6%
  O&M cost 6.3%

View Rate Schedule: Water

 

Sewer

Rate Costs
$6.6483/CCF water Resource cost 96.8%
  R&R cost 2.6%
  O&M cost 0.6%

View Rate Schedule: Sewer

 

Stormwater/Street

Rate Costs
$0.0452/ft. sq. of floor area Resource cost 88.2%
  R&R cost 6.8%
  O&M cost 5.1%

View Rate Schedule: Stormwater / Street


Energy Conservation

Incentive and Rebate Assistance

The Energy Office is responsible for taking advantage of various rebate and incentive programs associated with constructing efficiently. We are happy to assist any projects or departments wishing to do the same, including assistance with utility rebates and incentives for implementing efficiency measures offered through Rocky Mountain Power and Enbridge.

Requirements for eligibility under RMP Programs

In general, utility incentives call for specific pieces of equipment to meet minimum efficiency requirements. Rocky Mountain Power has a variety of incentive programs to meet your project’s needs. For more information, please visit the RMP website.

Requirements for eligibility under Enbridge Program

Enbridge pays a cash rebate for qualifying equipment. Check Enbridge’s website for details. Note: The building in which the project is occurring must be served under Enbridge’s GS rate schedule. Most buildings on campus are not GS.

 


Navigation

Home     Projects

Last Updated: 7/22/25