FY 2026 Utility Rates and Bill Collection Disbursement
Chilled Water
Rate | Costs | |
---|---|---|
$9.919/MMBtu | Resource cost | 69.5% |
R&R cost | 10.2% | |
O&M cost | 20.3% |
View Rate Schedule: Chilled Water
High Temperature Water
Rate | Costs | |
---|---|---|
$12.470/MMBtu | Resource cost | 80.9% |
R&R cost | 6.7% | |
O&M cost | 12.4% |
View Rate Schedule: High Temperature Water
Electricity
Projected Average Rate | Costs | |
---|---|---|
$0.08362/Kwh
|
Resource cost | 94.7% |
(see schedule for 2024 billing history) | R&R cost | 2.3% |
O&M cost | 3.0% |
View Rate Schedule: Electrical
Natural Gas
Projected Average Rate | Costs | |
---|---|---|
$6.189/Dth (5-year average) |
Resource cost | 95.0% |
(see schedule for 2023 billing history) | R&R cost | 2.7% |
O&M cost | 2.2% |
View Rate Schedule: Natural Gas
Water
Rate | Costs | |
---|---|---|
$5.0071CCF water | Resource cost | 79.7% |
R&R cost | 14.6% | |
O&M cost | 6.3% |
Sewer
Rate | Costs | |
---|---|---|
$6.6483/CCF water | Resource cost | 96.8% |
R&R cost | 2.6% | |
O&M cost | 0.6% |
Stormwater/Street
Rate | Costs | |
---|---|---|
$0.0452/ft. sq. of floor area | Resource cost | 88.2% |
R&R cost | 6.8% | |
O&M cost | 5.1% |
View Rate Schedule: Stormwater / Street
Energy Conservation
Incentive and Rebate Assistance
The Energy Office is responsible for taking advantage of various rebate and incentive programs associated with constructing efficiently. We are happy to assist any projects or departments wishing to do the same, including assistance with utility rebates and incentives for implementing efficiency measures offered through Rocky Mountain Power and Enbridge.
Requirements for eligibility under RMP Programs
In general, utility incentives call for specific pieces of equipment to meet minimum efficiency requirements. Rocky Mountain Power has a variety of incentive programs to meet your project’s needs. For more information, please visit the RMP website.
Requirements for eligibility under Enbridge Program
Enbridge pays a cash rebate for qualifying equipment. Check Enbridge’s website for details. Note: The building in which the project is occurring must be served under Enbridge’s GS rate schedule. Most buildings on campus are not GS.