Departments
- Building Official
- Business Services
- Campus Design and Construction
- Facilities Planning
- Plant Operations
- Public Safety
- Sustainability
Related Offices
Contact Info
- Campus Design & Construction
- 801-581-6883
- fax: 801-581-6081
- Send email
Major Construction Projects
Expanding Our Excellence
The purpose of this Web site is to communicate the impact of construction projects on vehicular and pedestrian movement around campus. Summaries of individual projects and their impacts are provided below. Maps in PDF format that identify specific impacts are available at the Zones of Construction page. Maps are provided demonstrating both the short term impacts for the upcoming three to four weeks as well as a longer term outlook covering three to four months. Questions and concerns regarding these impacts should be addressed to Campus Design & Construction using the contact information provided in the right column.
- David Eccles School of Business
- This project will replace the Francis A Madsen Building (FAMB) and the Kendall D Garff Building (KDGB) with a new building on the same site. More...
- HTW Pipeline Replacement – Engineering Area
- This project is replacing the high temperature water pipeline from the Student Services Pay Lot to Merrill Engineering, with branches to the east to the HEDCO complex and to the Warnock Building. More...
- HTW Pipeline Replacement – Health Sciences Area
- This project is replacing the high temperature water pipeline in the Health Sciences area Genetics to the Eccles Medical Library, and potentially to the University Hospital. More...
- Huntsman Cancer Hospital Expansion Phase IIB
- The Huntsman Cancer Hospital will be expanding immediately north of the existing Huntsman Cancer Hospital. More...
- James LeVoy Sorenson Molecular Biotechnology Building
- This project will construct a research facility and bring utilities to this green field site. More...
- North Chiller Plant
- This project will construct a 10,000 ton central chiller plant in the area north of the Alumni House. More...
- South Chiller Plant
- This project will construct a 3,000 ton central chiller plant in the basement of the existing central plant (building 303). More...
- Zones of Construction
- Short and long term maps providing a visual of construction activity have been created to help vehicle and pedestrian traffic navigate around campus. More...

